Before → after · wash it yourself
Job ticket
Nº 0384
Surface
Cedar privacy fence, 140 linear ft
Method
Pressure · 800 PSI fan tip
On site
1h 45m
Area
Fort Mill
Date
Paid
$165
DONE
“Two neighbors asked for his number before he’d packed up.”
Ken W.
Crew notes
Walk-around first: we marked the trouble spots, covered the beds and tested a small patch. The cedar privacy fence came up evenly on the first pass, so no second chemical round was needed.
Finished with a full rinse of windows, walks and plants, then a photo ticket sent to the customer before we left the street.
● Booking now · Next open slot Thursday
